Sectors
Client: Police
Ballistic Safety Consultant: G7SMS
Date Started: September 2013
Anticipated End date: May 2014
Value: £100k
Description – The project converted the existing Epperstone 100m Limited Danger Area range to a No Danger Area range by the provision of a canopy suitable for High Velocity round capture. The Range was superimposed onto a 500m Gallery Range and the canopy structure was designed to ensure that when the Gallery Range is in use its template is not compromised.