Darnall

 

Project Value: £10m

Client/Contractor: Community 1st Sheffield/Kier

Architect: Blue Sky Design Services

Duration: April 2009 - November 2012

New medical centre developed through the LIFT Framework in Darnall, Sheffield. The building was part two storey, part single storey steel frame with composite concrete / metal deck first floor and low-pitch roof. The steel frame was selected to provide adequate future flexibility and to accommodate the precise space requirements of the practitioners.

Historical mining was a feature of the site and the foundations were designed to bridge bell pits which were identified during excavation.

 

 